Antminer DR3
Super Profitable And Quick Return On Capital DCR Cryptocurrency Mining Machine, From Antminer DR3 ,High Quality Second-Hand Miner, Supports Blake256r14, Rated Power 7.8TH/S, Power Consumption 1410W New Low Power Consumption DDP duty-free transportation.
Rated calculation force | 7.8T±2% |
Frequency | 410M |
Fan | 12 V and 2.4 A |
Fan speed | front:6000rpm, rear:6000 rpm |
Working Temperature | 0 - 40℃ |
Ambient Humidity | 5% ~ 95% (non condensing) |
Noise | 76 dB |
Number of PCIE sockets | 10 |
Number of force calculation plates | 3 |
Number of chips | 162 |
PCB temperature | 85℃ |
Power Waste | 1410±7% |
Energy efficiency ratio | 80.73J/TH±7% |
Voltage | 11.6 - 13 V |
Weight | 3.8 KG |
Size | 293 x 130 x 187 mm |
Packing weight | 4.5 KG |
Package size | 415 x 215 x 295 mm |
Today, we saw the release of DCR (Dexin coin) mining machine ant DR3 on ant's official website. The price is 5000 yuan, quasi spot
At present, according to the calculation of DR3 7.8T, the daily income is about 70 yuan (pay attention to the risk of rising calculation power of the whole network)
SPECIFICATION PARAMETERS OF ANT MINER DR3:
1. Rated calculation force: 7.8th / s±5%
2. Wall power consumption: 1410w±10% (wall, AC / DC 93% efficiency, ambient temperature of 25℃)
3. Power efficiency: 180.73j/th ± 10% (on the wall, 93% efficiency of AC / DC, ambient temperature of 25℃)
4. Outer box size: 293mm (L) * 130mm (W) * 187mm (H)
5. Weight: 3.83kg
Similar products of other manufacturers include:
Core D9 (DCR miner): 2.8th/s, 1230w, power consumption ratio about 440W / T
Shenma DCR11 futures in January: 44T, known as power consumption ratio of about 55W / T
Ant DR3 power consumption ratio is about 180W / T
DCR INTRODUCTION:
The deced main network was officially launched in February 2016. At the beginning of the launch, the team first created 8% of the total money supply of 21 million, of which 4% was distributed to about 3000 early supporters in the form of free airdrop, and the other 4% was used to pay the development cost.
The remaining 92% of DCR is supplied and then produced by mining. The reward of each block is distributed to miners, voters and deced development fund pool in the proportion of 60 / 30 / 10. With the price return driven by the development of December, the development fund pool of December can give back to the participants who contribute to the project to the greatest extent.